COMPAMIR
High-Purity Fact Pipeline
© 2026 COMPAMIR | Verified Intelligence
High-Purity Fact Pipeline
City of Denver (Mayor Mike Johnston, Office of Climate Action)
Denver, Colorado, USA
May 25, 2026
Verified: May 25, 2026
"Denver plans to replace an aging steam heating system with a thermal energy network using water, geothermal energy, and sewage heat. The project aims to connect 11 city-owned buildings by 2030 to meet 2040 zero-emission goals. Estimated cost is $280-320 million, with the system utilizing heat pumps to share energy between buildings."